
← Back to Services
Engineering Geodesy & Axis Staking
High-precision measurements during construction. Axis staking, deformation monitoring.
Service Essence
Engineering geodesy ensures that the structure is built exactly where designed and at the correct elevation. We stake out building axes on site so builders can start foundations. We also perform vertical planning, volume calculations (e.g., gravel piles), and structural deformation monitoring.
Work Process
1
Data Analysis
Checking designer files and preparing for the instrument.
2
Staking
Marking axes on site with high precision (up to mm).
3
Act Preparation
Issuing staking act for the building authority.
Why Choose Us?
- ✓Setting out building axes
- ✓Deformation monitoring
- ✓Vertical planning
- ✓Volume calculations (quarries, warehouses)
You Will Receive
Staking act and scheme required for the construction log and supervisor.