Topoprojekts
Client portal Get a quote

As-built surveys in Liepāja — construction geodesy

As-built surveys for buildings and utilities for commissioning in Liepāja and Kurzeme. Underground utility mapping before trench backfilling. Certified surveyors.

Illustration: As-built surveys

As-built surveys are a mandatory part of construction documentation, confirming that the structure was built according to the design. We measure and document the actual position of buildings, utilities, and landscaping after construction completion. Underground utility as-built surveys are especially critical — water supply, sewerage, gas, electricity, communication cables. These measurements MUST BE DONE BEFORE trench backfilling, as utilities become invisible afterward. We work promptly and are ready to arrive on site at short notice. As-built survey documentation is required for building authority approval, commissioning, and ongoing utility database maintenance.

Who needs it

  • Building as-built surveys — actual position of structures and buildings
  • Utility as-built surveys — water, sewerage, gas, electricity lines
  • Communication as-built surveys — telecom and fiber optic cable routes
  • Road and pavement as-built surveys — transport infrastructure

And also: Landscaping as-built surveys — exterior improvements · Hidden works surveying — before backfilling or covering · Rapid site response — we work according to contractor schedules

How the work runs

  1. RequestWe receive information about the site and work type. For underground utilities — we coordinate arrival time before backfilling.
  2. SurveyingWe perform precise geodetic measurements with total station or GPS. We record coordinates, elevations, depths.
  3. Photo DocumentationWe take photographs referenced to measurement points. Especially important for hidden works.
  4. DocumentationWe prepare as-built drawings, coordinate lists, and compliance reports for building authority.

What you receive

As-built drawings in DWG/PDF format, coordinate list, compliance report (comparison with design), photo documentation. Documents valid for building authority approval and commissioning.

Documents needed

  • Construction project drawings (PDF or DWG)
  • Information about completed works
  • Site access for measurements

Related work

Get a quote

Tell us about the site — we prepare a quote within 1 business day. The first consultation is free.

What work do you need?
Where is the site?

For example: Dzērves iela 4, Saldus or cadastre number 84010010123

Any documents that would help?

A land register certificate, boundary plan, earlier surveys, drawings or photos — add them if you have them. You can also do it later.

You can also send documents to info@topoprojekts.lv — include your name and the site address.

When do you need it?

If there is a fixed date, such as a building permit or a sale deadline, enter it.

How do we reach you?
Customer

Contact

SIA "Topoprojekts"

  • LiepājaZirņu iela 7, LV-3401Map
  • SaldusPalejas iela 9, LV-3801Map

Office hours: Monday–Friday 9:00–17:00

+371 634 83194
info@topoprojekts.lv

We reply within 1 business day.